What Elevator Drawings Are Required Before Ordering?

Before ordering an elevator, buyers need to establish whether the building can accommodate the proposed equipment and whether the architectural, structural and electrical interfaces have been coordinated.

The buyer or project team typically provides available architectural plans, building sections, structural information and basic operating requirements. The elevator supplier provides or confirms a project-specific general arrangement (GA) drawing and relevant equipment interface information for review.

The key is to distinguish building drawings, supplier equipment drawings and documents required for installation and approval. Each serves a different purpose, and the complete installation documentation package may require additional information beyond what is needed for an initial quotation.

What Drawings Should You Prepare Before Ordering an Elevator?

The following table identifies the typical documents needed to assess an elevator project and clarifies who usually prepares them.

Drawing or documentTypically prepared or provided byWhat to verify
Architectural floor plans and building sectionsArchitect or project teamShaft location, floor levels, entrances and adjacent spaces
Elevator shaft plan and sectionArchitect or project team, coordinated with the supplierShaft dimensions, pit depth, overhead clearance and travel height
Structural drawingsStructural engineer or project design teamShaft construction, supporting structures and structural openings
Equipment load and interface informationElevator supplierEquipment reaction loads, support locations and fixing requirements
Elevator general arrangement drawingElevator supplierProposed car, doors, guide rails, counterweight and equipment layout
Electrical plans and interface informationBuilding electrical team and elevator supplier, according to scopePower supply, equipment locations, wiring boundaries and communication interfaces
Door, landing and finish detailsArchitect or project team, coordinated with the supplierOpening dimensions, finished floor levels and entrance configuration
Equipment specification and technical scheduleBuyer and elevator supplierRated load, speed, stops, travel height and agreed configuration

The party preparing a drawing is not necessarily responsible for approving it. The supplier provides equipment layout information and relevant loads, while the architect coordinates the building design and the structural engineer evaluates the supporting structure. The project contract and applicable local requirements determine the formal review and approval responsibilities.

The documents listed here support pre-order coordination and are not a substitute for the formal submission package required for a particular project.

For an initial quotation, preliminary drawings and available dimensions may be sufficient. Before the equipment configuration is finalized or production is released, the team must identify unresolved conditions that could affect feasibility, building work or contractual commitments.

Which Elevator Drawings Are Needed for Technical Review?

Architectural Floor Plans and Shaft Drawings

Architectural drawings establish the elevator’s position within the building and its relationship to surrounding spaces. Review the shaft location, served floors, entrance positions, adjacent walls, corridors, stairs and building services.

Confirm the measurement reference for every critical dimension. A structural opening, finished clear shaft dimension and clear door opening are not interchangeable. Wall finishes, projections and structural offsets can reduce usable space even when preliminary drawings appear consistent.

The drawings should identify the available shaft width and depth, floor levels, number of landings and entrance arrangements. For projects involving elevator shafts, the architectural information must be coordinated with the proposed equipment arrangement rather than assessed in isolation.

For existing buildings, verify critical dimensions on site instead of assuming that original drawings reflect current conditions.

Elevator Shaft Section Drawings

A shaft section establishes the available vertical space and should show the pit, overhead, floor elevations, total travel and any machine room or equipment space.

  • Pit depth affects the arrangement of buffers, equipment and required safety spaces below the lowest landing.
  • Overhead clearance determines whether the proposed equipment and required safety spaces fit above the highest landing.
  • Floor-to-floor heights and travel establish the vertical relationship between landings and help identify inconsistencies in the equipment schedule.
  • Machine room or equipment space must accommodate the relevant equipment, access routes and applicable maintenance clearances.

Insufficient pit depth or overhead clearance can restrict equipment selection or require building modifications. The required dimensions depend on the selected elevator system and applicable requirements, so generic dimensions should not be used as final approval criteria.

For machine-room-less elevators, the review should also establish where maintainable equipment is located, how technicians can safely access it and whether the required working clearances are available. The absence of a separate machine room does not eliminate equipment access or maintenance requirements.

Where applicable, confirm the location and accessibility of pit ladders, lighting, stop switches and other required provisions against the project-specific layout and governing requirements.

Elevator shaft drawings showing pit depth, overhead clearance and floor levels

Elevator General Arrangement Drawings

An elevator general arrangement drawing, commonly called a GA drawing, shows how the proposed equipment fits within the building. Depending on the system, it may include the car, landing doors, guide rails, counterweight, machinery, control equipment, dimensions and relevant interfaces.

The supplier may issue a preliminary layout during quotation or configuration review. More detailed drawings may follow after the configuration and contractual requirements have been established.

Review the GA drawing against the building information and equipment specification.

  • Car dimensions and rated load
  • Door width, height and opening arrangement
  • Guide rail and counterweight positions
  • Equipment locations and available clearances
  • Support points and equipment loads
  • Access needed for installation, inspection and maintenance

Two proposals with the same rated load may still differ in car dimensions, door arrangement, drive system or equipment placement. When comparing configurations, verify that each drawing represents the quoted equipment and identify any provisional dimensions or unresolved interfaces.

The GA drawing should provide sufficient information to assess access to maintainable equipment and the relevant working clearances. Depending on the configuration, this may include the arrangement of machinery, control equipment, entrance assemblies, rail supports and other installation interfaces.

A preliminary GA drawing supports planning but does not prove that every building condition has been verified or that all required approvals have been obtained.

For projects involving commercial applications, review the proposed configuration against the intended building use and the supplier’s technical specifications. EKCNE’s commercial elevator systems provide a starting point for discussing project requirements.

Structural Drawings and Equipment Loads

Structural coordination establishes how the proposed elevator interacts with the building’s load-bearing elements. Relevant information may include shaft wall construction, supporting beams, embedded plates, fixing arrangements and equipment reaction loads.

Structural drawings and equipment load information are complementary documents, not substitutes for one another.

  • Building structural drawings show the existing or proposed structural conditions, including supporting elements and relevant openings.
  • Supplier equipment data identifies the loads and support conditions associated with the proposed elevator configuration.
  • Structural engineering review evaluates whether the building structure and proposed support arrangements are suitable.
  • Construction coordination ensures that approved supports, embedded components and openings are incorporated into the building work.

Responsibilities should be defined before the design is finalized.

  • The elevator supplier provides equipment loads and interface information for the proposed configuration.
  • The structural engineer evaluates the building structure and proposed supports.
  • The architect or project team coordinates structural requirements with the building design.
  • The contractor carries out approved structural work within the agreed scope.

The arrangement depends on the elevator type. A system with a separate machine room may have different support requirements from a machine-room-less elevator.

Equipment load data must correspond to the proposed configuration and support arrangement. If either changes, the structural review may need to be repeated. A shaft drawing alone does not establish structural adequacy.

Where structural elements form part of the installation or alteration, the relevant design professionals must determine whether additional calculations, drawings or approvals are required for the project.

For related component specifications, EKCNE’s elevator guide rails and elevator buffers categories provide examples of equipment groups that may be relevant to the overall arrangement. Product information does not replace project-specific load data or structural review.

Electrical Drawings and Interface Requirements

Electrical coordination establishes the power supply, equipment locations and boundaries between elevator wiring and building electrical work.

InterfaceInformation to confirmResponsibility to clarify
Power supplyVoltage, frequency, capacity and supply locationBuilding electrical team and elevator supplier
Control equipmentControl cabinet location and required spaceElevator supplier and project team
Wiring routesCable routes and connections between building and elevator systemsElectrical contractor and elevator supplier
Grounding and electrical provisionsApplicable requirements and connection arrangementsResponsible electrical professionals and supplier
Communication and monitoringRequired interfaces, cabling and external equipmentProject team, supplier and relevant system contractor

The supplier’s wiring diagrams do not automatically define the complete building-side electrical scope. Confirm which cables, connections, external devices and installation work are included in the elevator supply and which must be provided by other contractors.

For projects involving monitoring rooms, access control or building management systems, establish the required interfaces before the electrical design is finalized. During initial inquiry, buyers should provide known supply conditions and project requirements so the supplier can identify missing information.

Where relevant, EKCNE’s elevator control system category can help readers identify the general equipment group involved. The actual control arrangement and electrical requirements must still be confirmed for the selected system.

Door, Landing and Finish Details

Door and landing drawings coordinate the elevator entrances with the building’s architectural design. Review the clear opening width and height, door arrangement, landing position, finished floor level and surrounding wall construction.

Finished floor levels require particular attention because architectural drawings may show structural slab elevations rather than final floor levels. Confirm the reference used for the landing sill and entrance dimensions.

For elevators serving multiple sides of the shaft, verify the entrance arrangement on every served floor. Decorative choices can remain provisional where the contract allows, but any selection affecting dimensions, weights, clearances or equipment interfaces should be resolved before the relevant design is finalized.

Which Drawings Should Be Reviewed at Each Ordering Stage?

Document requirements vary by contract and supplier. The following workflow separates preliminary assessment from configuration confirmation and later delivery stages.

Project stageMain activitiesExpected document status
Initial inquiry and budget quotationShare available building drawings, key dimensions, intended use and performance requirementsPreliminary information is acceptable if assumptions are identified
Configuration reviewCoordinate shaft dimensions, pit, overhead, entrances, structural conditions and electrical interfacesCritical compatibility issues have a documented conclusion or action
Order confirmation and production releaseComplete the technical reviews and approvals required by the contractAgreed formal documents and approval records are available
Installation preparation and handoverConfirm site readiness and complete applicable installation, commissioning and handover documentationDocuments are provided according to project scope and applicable requirements

This is a planning framework, not a universal approval sequence. Some projects require specific drawing approvals before order confirmation, while others allow commercial confirmation before all detailed drawings are finalized. The contract, supplier’s document schedule and applicable requirements determine the actual milestones.

What Can Remain Provisional?

Decorative selections or noncritical options may remain open during an initial quotation if they do not prevent a meaningful assessment of the proposed configuration.

Unresolved shaft dimensions, pit depth, overhead clearance, entrance arrangements or structural interfaces may directly affect feasibility. The supplier should identify which open items affect pricing, equipment configuration, building work or production release.

Record each unresolved item with a responsible party and a required action. A preliminary quotation should not be treated as an approved construction layout or a guarantee that the elevator will fit the completed building.

How to Review Elevator Drawings Before Order Approval

Resolve Conflicting Dimensions

Consider a project in which the architectural floor plan shows a shaft width that differs from the available space indicated in the structural drawing. The supplier’s preliminary GA drawing was prepared using the architectural plan.

The apparent fit does not establish that the proposed configuration is suitable. Resolve the discrepancy before approving the affected design.

  1. Check drawing revisions. Confirm issue dates, revision identifiers and whether both documents reflect the current design.
  2. Verify measurement references. Determine whether dimensions refer to structural surfaces, finished surfaces or another reference.
  3. Identify the discrepancy. Check for wall finishes, structural offsets, obstructions or inconsistent dimensions.
  4. Assign responsibility. Ask the architect or relevant design professional to confirm the building dimensions and the supplier to assess their impact on the elevator layout.
  5. Revise and record the decision. Update affected drawings, document the agreed dimensions and obtain the required approvals.

The issue is resolved only when the responsible parties agree on the applicable dimensions and the affected drawings reflect those conditions. If the available space cannot accommodate the proposed arrangement, the team must assess a revised configuration or a feasible building modification.

Maintain a Drawing Register

A drawing register records document revisions, unresolved issues, responsible parties and required actions. The following example is a template, not a record of an actual project.

Drawing referenceRevision or statusOpen issueResponsible partyRequired action
Architectural shaft planLatest issued revisionConfirm clear shaft dimensionsArchitect or project teamVerify against structural information
Elevator GA drawingPreliminaryConfirm equipment configurationElevator supplierRevise after technical review
Electrical interface planPendingConfirm supply and connection scopeElectrical team and supplierAgree on interface requirements

Use consistent status labels such as confirmed, provisional, pending verification and approved for the intended purpose. A drawing marked preliminary should not be treated as approved for construction simply because it has been circulated.

Before production release, verify that the equipment specification, applicable drawings and documented approvals represent the same configuration.

How Do New Construction and Modernization Projects Differ?

New construction projects require coordination before the relevant building work is fixed. The priority is to align the shaft, pit, overhead, entrance openings, structural supports and electrical interfaces with the proposed elevator configuration.

Existing buildings and modernization projects require verification of actual conditions. Original drawings may not reflect alterations, structural offsets or current shaft dimensions. The project may need site measurements, existing equipment records, an assessment of equipment removal and delivery routes, and a plan for access and shutdowns in occupied buildings.

For modernization work, record discrepancies between the drawings and the site. Identify the surveys or investigations needed before finalizing the replacement configuration.

Elevator Drawing Checklist Before Ordering

Use this checklist to organize the initial inquiry and technical review.

Building and architectural information

  • Latest available architectural floor plans and relevant sections
  • Shaft location and dimensions, including measurement references
  • Number of served floors, landings and entrances
  • Floor-to-floor heights and total travel height
  • Pit depth and overhead clearance, with verification status
  • Door opening dimensions and entrance arrangements
  • Machine room or equipment space information, where applicable

Equipment and structural coordination

  • Intended application and basic performance requirements
  • Proposed rated load, speed, stops and equipment configuration
  • Project-specific GA drawing, when available
  • Structural drawings and relevant support conditions
  • Equipment reaction loads and fixing interfaces for the proposed configuration
  • Known conflicts with structural elements or building services

Electrical and project documentation

  • Available power supply information
  • Control, communication and monitoring interface requirements
  • Building-side electrical responsibilities
  • Drawing numbers, revisions and issue dates
  • Provisional dimensions and unresolved technical questions
  • Agreed drawing review, approval and production release milestones
  • Applicable project submission and approval requirements

Not every item must be finalized before requesting a budget quotation. The checklist distinguishes available information from outstanding requirements and identifies what must be resolved before the relevant technical and commercial commitments are made.

Discuss Your Elevator Project Requirements with EKCNE

Share the available architectural drawings, shaft dimensions, floor information and basic operating requirements with EKCNE to establish a starting point for project review.

If dimensions remain provisional or the building has space constraints, identify them early. This helps the project team determine which conditions may affect equipment selection, building coordination, procurement scope and installation planning.

Contact EKCNE to discuss your elevator project requirements and identify the next steps toward a configuration that fits the building and the agreed project conditions.

FAQ

What drawings are needed for an elevator quotation?

An initial quotation can often begin with architectural floor plans, available shaft dimensions, relevant sections, floor levels, number of stops, intended use and basic equipment requirements. The supplier may request additional information to assess structural, electrical or configuration constraints.

Elevator suppliers commonly provide or confirm project-specific layout drawings for the proposed configuration. The scope, timing and approval responsibilities depend on the supplier’s documentation process and project agreement. Preliminary drawings should not be treated as approved construction documents unless they have been issued and accepted for that purpose.

The approval sequence depends on the contract, project requirements and applicable regulations. An initial quotation may use preliminary information, while configuration confirmation, drawing approval and production release follow the agreed process. Establish which documents and approvals are required at each milestone.

The main dimensions typically include shaft width and depth, pit depth, overhead clearance, floor-to-floor heights, total travel, landing opening dimensions and relevant machine room or equipment space. Check their adequacy against the selected elevator configuration and applicable requirements.

Leave a Reply

Your email address will not be published. Required fields are marked *

Table of Contents

Elevator Parts

Escalator Parts

All Elevators

Please enable JavaScript in your browser to complete this form.