Indonesia Project: Fulfilling a 100+ Item Parts List Before Chinese New Year

When an Indonesian client approached us with a multi-page procurement list containing over 100 different elevator components, they were frustrated.
They had already contacted multiple Chinese suppliers, but none had the complete inventory or the capacity to process such a complex, fragmented order.

Many items on their list were vague:

  • Missing model numbers
  • Unclear categories
  • Lacking technical parameters

Here is how we leveraged our deep supply chain expertise to verify, pack, and ship this massive order right before the holiday shutdown.

How We Solved the Procurement Nightmare

1. The Ultimate Inventory Advantage

Most elevator factories only stock parts for their own production.

However, before establishing our manufacturing facility, our founder operated a large-scale elevator component distribution warehouse.

This gives us:

  • Exceptionally broad inventory coverage
  • Access to diverse component categories

While other suppliers could only fulfill 30% to 40% of the list, we successfully sourced 100% of the required components under one roof.

2. Meticulous Part Matching (Zero Error Rate)

A vague parts list creates high risk in international shipping.

Instead of guessing, our technical team:

  • Cross-referenced every single item
  • Verified photos, specifications, and model numbers
  • Maintained continuous communication with the client

We carefully validated over 100 individual components, resulting in a 0% error rate upon delivery.

3. Export-Grade Wooden Crating vs. Woven Bags

Many suppliers reduce costs by using:

  • Woven sacks
  • Low-quality cardboard boxes

This often leads to damage or loss during transit.

Our approach:

  • Systematic organization of all components
  • Secure packing in export-grade wooden crates

Benefits:

  • Strong protection for mechanical and electrical parts
  • Easy inventory verification upon arrival

4. Beating the Chinese New Year Deadline

The order was finalized just before the Chinese New Year holiday, a critical logistics bottleneck.

Challenges included:

  • Freight forwarders stopping shipments
  • Domestic transport shutting down

Instead of delaying the order, our logistics team:

  • Contacted multiple forwarding partners
  • Secured a last-minute shipping solution

We successfully delivered the crates to the export warehouse just hours before the holiday cutoff.

Project Summary: Component Sourcing

Client ChallengeOur Factory Solution
Incomplete 100+ Item List1-on-1 verification of photos, specs, and models
Fragmented Supply Chain100% fulfillment through integrated sourcing
High Risk of Damage/LossUpgraded to secure wooden crate packaging
CNY Logistics ShutdownSecured last-minute freight forwarding

Stop Struggling with Fragmented Suppliers

If you are an elevator maintenance company or distributor dealing with:

  • Multiple suppliers
  • Missing components
  • Poor packaging

We can simplify your entire procurement process.

Send us your parts list — no matter how complex — and our team will handle sourcing, verification, and delivery with precision.

Leave a Reply

Your email address will not be published. Required fields are marked *

Table of Contents

Elevator Parts

Escalator Parts

All Elevators

Please enable JavaScript in your browser to complete this form.